MDR-80 Cable Assembly – Complete
STATEMENT OF WORK
ACTION
September 2019 D. Gillette Industrial Services was contracted to address the manufacture, assembly, and delivery of the of the Cable Assembly Set, MDR-80 in support of the Squadron transitions from Legacy Aircraft (F/A-18 A-D) to Super Hornet Aircraft (F/A-18 E/F) at NAS Oceana.
DGI worked with Bowhead Manufacturing procure the items necessary to complete the MDR-80 Cable Assembly. The items were procured, inspected, tested, and delivered in advance of the contract deadline.
RESULT
The MDR-80 Cable Assembly Set was delivered on time with zero defects.